
1
2
3
1
End of shaft with nut
2
Washer
3
Elbow
Connection to the gas supply should be with
either rigid or semi-rigid pipe, i.e. steel or
copper.
The connection should be suitable for
connecting to R 1/2 (1/2 BSP male thread).
When the final connection has been made, it
is essential that a thorough leak test is
carried out on the hob and installation.
Make sure that the main connection pipe
does not exert any strain on the hob.
If you use flexible metal pipes make sure that
they agree to ISO 10380 and ISO 10807
standards. Be careful they do not come in
touch with mobile parts or they are not
squeezed. Also be careful when the hob is
put together with an oven.
Important! It is important to install the
elbow correctly, with the shoulder on the
end of the thread, fitted to the hob
connecting pipe.
Important! Failure to ensure the correct
assembly will cause leakage of gas.
Important! Make sure that the gas supply
pressure of the appliance obeys the
recommended values.
Rigid connection:
Carry out connection by using metal rigid
pipes (copper with mechanical end).
Injectors replacement
1. Remove the pan supports.
2. Remove the caps and crowns of the
burner.
3. With a socket spanner 7 remove the
injectors and replace them with the
ones which are necessary for the type
of gas you use (see table in Technical
Data section).
4. Assemble the parts, follow the same
procedure backwards.
5. Replace the rating plate (it is near the
gas supply pipe) with the one for the
new type of gas supply. You can find this
plate in the package supplied with the
appliance.
If the supply gas pressure is changeable or
different from the necessary pressure, you
must fit an applicable pressure adjuster on
the gas supply pipe.
Adjustment of minimum
level
To adjust the minimum level of the burners:
1. Light the burner.
2. Turn the knob on the minimum
position.
3. Remove the knob.
4. With a thin screwdriver, adjust the by-
pass screw position.
8
Comentarios a estos manuales